In a letter to staff, seen by the BBC, Stuart Crooks, the managing director of Hinkley Point C, said substantial design changes, required by British regulations, meant there were 7,000 changes that needed to be made to the site, with 35% more steel and 25% more concrete needed than originally planned.
Credit: Source link